长隧道引水式“一洞双机”水电站运行方式研究 被引量:3

Research on the Operation Way of Hydropower Station with Long-distance Diversion Tunnel and Dual Holes
下载PDF
导出
摘要 长隧道引水式"一洞双机"水电站因坝体投资小、水能利用率高被广泛使用,同时因水能波动大、水力干扰复杂等因素决定电站运行方式选择更加困难。详细介绍"一洞双机"电站机组开机、负荷调整、调速器运行方式和安控切机策略等研究方法,对类似电站运行方式研究有一定的实际借鉴意义。 Hydropower station with long-distance diversion tunnel and dual holes is widely used for its low investment and high hydropower utilization,and to choose the operation way of hydropower stations is more difficult because of large hydropower wave and complex hydraulic disturbance.This paper introduces in detail the starting up of the station unit,load adjustment,governor operation and the structure of security and stability control system of hydropower station with dual hole.It possesses the directing significance for similar operation way of hydropower stations.
作者 余平 陈鹏
出处 《中国农村水利水电》 北大核心 2014年第6期150-153,157,共5页 China Rural Water and Hydropower
关键词 水力干扰 负荷调整 调速器 安全稳定 控制系统 hydraulic disturbance load adjustment governor security and stability control system
  • 相关文献

参考文献10

二级参考文献34

共引文献74

同被引文献30

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部