2Oya I. Tukel, Walter O. Rom , Sandra Duni Eksioglu. An Investiga- tion of Buffer Sizing Techniquesin Critical Chain Scheduling[J]. Euro- pean Journal of Operational Research ,2006,(172). 被引量:1
7Willy Herroelen, Roel Leus. On the Merits and Pitfalls of Critical Chain Scheduling [J]. Journal of Operational Management, 2001, 19(2). 被引量:1
8Herman Steyu. An Investigation into the Fundamentals of Critical Chain Projects Scheduling [J]. International Journal of Project Management, 2000,(19). 被引量:1
9BOttcher, Andreas Drexl. Project Scheduling under Partially Renewable Resource Constraints [J]. Management Science, 1999, 45 (4). 被引量:1
10Icmeli, O., Erenguc, S. A branch and Bound Procedure for The Resource Constrained Project Scheduling Problem with Discounted cash flows [J]. Management Science,1996, 42 (10). 被引量:1