广州地铁8号线北延段电力监控系统主站设备设计方案研究 被引量:3

Main Station Design of SCADA System for the North Extension of Guangzhou Metro Line 8
下载PDF
导出
摘要 由于广州地铁新线出现了较多的延伸线,电力监控系统主站设备需进行改造。介绍了广州地铁2、8号线既有电力监控系统主站设备概况,分析了改造方案的设计要求,提出了广州地铁8号线北延段工程主站设备的方案:方案一为利用既有电力监控系统主站,进行升级改造;方案二为新设电力监控系统主站,实行2、8号线中央级设备拆解。从投资、施工、过渡方案及运营等方面进行了方案比选,最终选定方案一为工程的实施方案。 Due to the continued extension construction of new metro lines in Guangzhou, the SCADA system of main stations needs to be upgraded. The general situation of SCADA system of the main stations on Guangzhou metro Line 2 and Line 8 are introduced, according to the design requirements, feasible schemes of the main station design for the north continued extension of Line 8 is put forward: one is to upgrade the old SCADA system; another is to build a new station. Through comparison,scheme I is selected as the final project implementation plan from the aspects of investment, construction, transition scheme and operation.
作者 陈乃海
出处 《城市轨道交通研究》 北大核心 2014年第7期70-72,共3页 Urban Mass Transit
关键词 地铁 电力监控 主站 metro power supervisory control and data acquisition (SCADA) system main station
  • 相关文献

参考文献3

二级参考文献11

共引文献6

同被引文献8

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部