由于广州地铁新线出现了较多的延伸线,电力监控系统主站设备需进行改造。介绍了广州地铁2、8号线既有电力监控系统主站设备概况,分析了改造方案的设计要求,提出了广州地铁8号线北延段工程主站设备的方案:方案一为利用既有电力监控系统主站,进行升级改造;方案二为新设电力监控系统主站,实行2、8号线中央级设备拆解。从投资、施工、过渡方案及运营等方面进行了方案比选,最终选定方案一为工程的实施方案。
Due to the continued extension construction of new metro lines in Guangzhou, the SCADA system of main stations needs to be upgraded. The general situation of SCADA system of the main stations on Guangzhou metro Line 2 and Line 8 are introduced, according to the design requirements, feasible schemes of the main station design for the north continued extension of Line 8 is put forward: one is to upgrade the old SCADA system; another is to build a new station. Through comparison,scheme I is selected as the final project implementation plan from the aspects of investment, construction, transition scheme and operation.