摘要
舍埠排灌站基础在施工过程中遇到了流沙,出现了管涌现象,边坡塌方严重,基础受到破坏.必须采取相应的措施,进行加固处理,保证地基的稳定.本文结合实践和经验,介绍以松木桩加块石挤淤的方法来处理基础.
In the construction course of the foundation of Shebu Drainage and Irrgation Station,quicksand and piping phenomenon took place.The slope landslide is serious and the foundation is destroyed.So the relevant measure should be adopted in order to reinforce it and ensure the foundation stability.Combined with our practice and experience,the foundation treatment mothod of hitting pine pile and dumping rock and extruding silt is introduced in this paper.
出处
《江西水利科技》
2014年第2期159-160,共2页
Jiangxi Hydraulic Science & Technology
关键词
舍埠排灌站
松木桩
块石挤淤
基础处理
方法
Shebu Drainage and Irrigation Station
Pine pile
Dumping rock and extruding silt
Foundation treatment
Method