摘要
阐述平圩发电有限责任公司二期机组接入淮南特高压系统后厂用电系统的特点,并针对公司现场实际情况,研制了二期机组厂用电切换系统,解决了二期机组在启、停过程中厂用电的切换问题。
Elaborated the characteristics of plant power system after Pingwei power generator co.,ltd phase Ⅱ unit access the Huainan UHV system,and aimed at the scene actual situation of company,developed phase Ⅱ unit power switching system.Solved plant power switching problem of phase Ⅱ unit in the process of starting and stopping.
出处
《安徽电力》
2014年第3期21-23,共3页
Anhui Electric Power
关键词
特高压电网
发电厂机组
厂用电切换
同期装置
备自投
DCS
UHV power grid
power plant unit
auxiliary power switch
synchronizing device
self power input device
DCS