摘要
主要介绍人工挖孔桩施工的事前准备、施工中质量管理和施工后的质量检测 ,并针对施工过程发生的流砂、流泥现象 ,讨论了常用的几种处理措施。
The arranging process,the supervision of construction quality and the inspection tests for hand-dug piles are introduced in this paper.Several available measures are discussed to resolve the flowing sand or the flowing soil during constructing hand-dug piles.
出处
《福建建设科技》
2002年第2期15-16,共2页
Fujian Construction Science & Technology