摘要 金塘水道南岸西口建有中石化镇海炼化公司算山码头区和北仑港电厂两大工程 ,其中镇海炼化公司共建有 2 5万 t、5万 t级及其它码头 5个 ,最东侧为 2 5万 t级原油码头 ,与北仑港电厂取排水口毗邻。此码头东侧距电厂取水口 1 3 0 m,而电厂排水口位于该码头侧后方约 860 m。电厂采用明渠排水方式 ,排水通道会在低潮位时直冲码头工作平台。 1 998年曾发生 2 5万 t级船舶系泊作业时断缆使船舶产生漂移的险情。研究断缆导致船舶产生漂移的原因的同时 ,并提出了对策措施以确保船舶安全系泊作业。 On the south bank of the Jintang Channel,there are two important coastal engineering,the Beilun Port Power Plant and the soil wharfs(No 1~No 5)of Zhenhai Refining & Chemical Company Limited.No 1 soil wharf,a docking capacity of 250 000 dwt,is only 130 m away from the drainage mouth of the Beilun Port Power Plant.The inlet mouth is 860 m away from the back of No 1 soil wharf.It is found that water from the drainage mouth will impact the workbench of No 1 wharf when the tide is ebbing.In 1998,when a ship with the capacity of 25 000 dwt was mooring,the cable was broken.So,in this paper,the reason for the excursion of the ship is studied based on the simulation of current,and the solutions to the problem are also mentioned in order to ensure safe mooring
出处 《海洋地质动态》 2002年第3期18-22,共5页 Marine Geology Letters
关键词 海岸工程 船舶稳定 潮流模拟 金塘水道 台风 宁波市 coastal engineering mooring stability current simulation Jintang Channel
  • 相关文献

参考文献6

  • 1程心一.计算流体动力学[M].科学出版社,1984. 被引量:2
  • 2T.J.Chung,著,张二骏,等泽.流体动力学的有限元分析[M].水利电力出版社. 被引量:1
  • 3赵士清.长江口潮流的一种数值模式[J].海洋与湖沼,1985,16(1):18-27. 被引量:9
  • 4刘家驹.连云港外航道的回淤计算及预报[J].水利水运科学研究,1980,(4):31-42. 被引量:13
  • 5曹祖德,王运洪著..水动力泥沙数值模拟[M].天津:天津大学出版社,1994:347.
  • 6黄胜 卢启苗.河口动力学[M].北京:水利电力出版社,1992.80-108. 被引量:6