摘要
通过对哈尔滨市红旗大街现状交通的调查与分析 ,提出了实行线控制系统的可能性 ,对某些交叉口和路段进行特殊处理 ,使整条路线更适合线系统控制。通过系统设置前后延误分析比较 ,证明系统设置取得了较好的效果。
The possibility of using line control system is by research and analysis about the traffic actualities of Hongqi street in Harbin .Some crossroads and section of a street arespecialls in order to make all the street fit the line control system better.That system setting make a good effect ,and is proved by comparing and analysing the delay between earlier and final of system setting.
出处
《应用科技》
CAS
2002年第5期30-33,共4页
Applied Science and Technology