摘要
介绍了自动发电系统 (AGC)构成和控制方案的实现 ,对系统投运过程中的影响因素进行综合分析。为了提高单元机组负荷响应速率和负荷响应的滞后时间 ,在模拟、仿真、试验的基础上 。
It introduces the structure and realization of AGC control methods,Analyses comprehensively the factors that influencing the unit operation,so as to increase the response speed and rate and shorten the delayed time.The coordinated control system is greatly upgrated on base of imitation,stimulation and test.
出处
《山西电力》
2002年第3期35-36,45,共3页
Shanxi Electric Power
关键词
AGC
自动发电控制系统
电厂
协调控制系统
AGC automatic generating control
influenced factors
coordinated control system