期刊文献+

用于地下工程中抗上拔荷载的桩锚技术综述 被引量:10

Summary of Technique for the Pulling Resistant Pile and Anchor in Underground Engineering
下载PDF
导出
摘要 抵抗结构的上拔荷载目前已成为工程建设中一个经常面临的问题。采取压重式的抗拔措施增加了土方量或砼量 ,因不经济而较少采用。经常采用的措施是使用抗拔桩或抗拔锚杆。由于目前对抗拔桩锚的抗拔承载机理缺乏深入了解 ,设计计算理论尚不成熟 ,并且没有现成的规范作为设计依据 ,因而在一定程度上影响了抗拔桩锚技术的推广应用。本文对不同类型的抗拔桩和抗拔锚杆分析作了介绍。 The problem how to resist the pulling force on the structure is often met in today's engineering construction. It is not economical to solve the problem by adding soil and concrete to increase the pressure. Usually, the pulling resistant pile and anchor was used. To a certain extent, the expanding and applying of this method nowadays is limited because there is lack of knowledge about the mechanism of the pulling resistant pile and anchor, the incompleteness of the design theory and it is not included in any existed specifications. In this paper different kinds of pulling resistant pile and anchor are introduced to provide a reference for the professionals.
作者 姜伟
出处 《地下空间》 CSCD 2002年第2期123-126,共4页 Underground Space
关键词 地下工程 上拔荷载 抵抗结构 等截面 pulling resistance pile anchor technique
  • 相关文献

参考文献4

  • 1刘祖德 刘金励.抗拔桩基础.桩基工程技术[M].中国建材工业出版社,1996,8.. 被引量:3
  • 2李文彬.爆破扩孔垂直锚杆试验与运用[J].特种结构,1985,1. 被引量:1
  • 3曹正康 周质炎.在饱和软粘土地基中土锚技术用于地下水池抗浮的工程实践[J].特种结构,1987,1. 被引量:1
  • 4胡鹏程.爆扩短桩在软土中的运用[J].建筑技术,1980,2. 被引量:1

共引文献2

同被引文献106

引证文献10

二级引证文献101

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部