朔州市恢河大桥上跨铁路立交桥跨铁路部分,原设计由于未充分考虑桥梁施工对铁路运营的影响,造成工程停工。分析了其原因,并介绍了变更设计桥式方案研究过程。
The interchange project of Shuzhou Huihe River Bridge crossing over the railway has been shut down because of the original design not fully considering the influence of bridge construction on the railway operation. This paper analyzes its causes, and introduces the study process of altering the design scheme of interchange type.
作者
元信文
刘容
刘瑞
Yuan Xinwen;Liu Rong;Liu Rui
出处
《城市道桥与防洪》
2019年第2期100-101,M0011,共3页
Urban Roads Bridges & Flood Control
关键词
恢河大桥公铁立交
铁路运营
桥型方案比选
highway -railway interchange of Huihe River Bridge
railway operation
comparison and selection of bridge scheme