福前铁路位于黑龙江东北部,沿途辐射福利屯、红兴隆、富锦、建三江等经济据点,是地区内唯一的铁路通道。既有线路因建设年代久远,标准低下,通过能力已经难以满足运输需求,迫切需要进行扩能改造。本次研究首先从既有线路标准及运营概况入手,分析线路存在的主要问题和薄弱环节,以确定改造目标;其次,以客货运量与通过能力的适应性分析为基础,研究可能的扩能改造方案,并提出满足客货运输需求的扩能改造措施。
The Fulitun-Qianjin Railway is located in the northeast of Heilongjiang. It radiates economic bases such as Fulitun, Hongxinglong, Fujin and Jiansanjiang along the way, and is the only railway channel in the region. Due to the old construction of existing lines and low standards, it is difficult to meet the transportation requirements, and urgent to enlarge capacity and reconstruction. This research started with the standards and operation general situation of the existing line, analyzed the main problems and weaknesses of the line, in order to determine the target of expansion and reform. Secondly, based on the adaptive analysis of passenger and cargo volume and passing capacity, research on possible scheme of enlarging capacity and reconstruction was carried out, and the measures to meet the needs of passenger and cargo transportation requirements were put forward.
作者
王秋燕
崔久玲
Wang Qiuyan;Cui Jiuling(China Railway Fifth Survey and Design Institute Group Co.Ltd.,Beijing 102600,China;China Railway Corporation,Beijing 100844,China)
出处
《铁道建筑技术》
2018年第12期42-44,共3页
Railway Construction Technology
关键词
扩能改造
方案研究
通过能力
enlarging capacity and reconstruction
scheme research
passing capacity