以上海董家渡金融城工程超大深基坑为例,通过开展专项水文地质试验,分析了基坑所面临的承压水综合治理风险,进而提出在群坑耦合基础上的降水设计思路。通过现场承压水试抽水试验,提出了合理的降水运行方案,制订了相应的配套措施并实施,达到了预期的地下水控制目标。
Taking the ultra-deep foundation pit of Shanghai Dongjiadu financial city project as an example,and through carrying out specific hydrogeological tests,a comprehensive risk treatment of confined water in the foundation pit is analyzed and then a design idea of water-lowering on the basis of group pits coupling is proposed. Through the trial pumping test of on-site confined water,a rational water-lowering operation scheme is put forward, the corresponding supporting measures are set out and implemented and the expected groundwater control objectives are achieved accordingly.
作者
闫雁军
李侠
陆建生
白天明
YAN Yanjun;LI Xia;LU Jiansheng;BAI Tianming(Shanghai Construction No.7 (Group)Co.,Ltd.,Shanghai 200050,China;Shanghai Guanglian Environmental & Geotechnical Engineering Co.,Ltd.,Shanghai 200444,China)
出处
《建筑施工》
2018年第12期2041-2043,共3页
Building Construction
基金
上海市科学技术委员会科研计划项目课题(16DZ1200206)
上海市科学技术委员会科研计划项目课题(17QB1402100)
关键词
环境水文地质评价
群坑耦合
试抽水试验
地下水控制
environmental hydrogeological evaluation
group pits coupling
trial pumping test
groundwater control