期刊文献+

留矿法大尺度采场稳定性数值模拟分析 被引量:2

Numerical Simulation Analysis on the Stability of Large-scale Mining Stope Mined by Shrinkage Method
原文传递
导出
摘要 针对安徽某矿区工程地质条件和大尺度采场结构参数的现状,按浅孔留矿法对计划回采采场进行数值模拟计算,对采场和矿柱的应力、位移及塑性变化进行预分析,结果表明,10#及11#采场上盘岩体均存在较大面积冒落的危险,回采过程中必须采取相应措施进行支护,9#采场顶板及上盘岩体稳固性较差,设计的采矿方案难以保证安全,提出改用下向扇形深孔分段空场法进行回采。 According to the present situation of engineering geological conditions and structural parameters of large scale mining field in a mining area of Anhui,the numerical simulation was carried out on the planned mining field mined by short-hole shrinkage method.And the pre-analysis was carried out on stress,displacement and plastic variation about the mining field and the pillar.The analysis showed that the upper orebodies of No.10and No.11stope were in danger of falling in large areas,and corresponding measures should be taken during the mining process.The roof and the upper orebody of No.9stope were not stable,and the designed mining schemes were difficult to guarantee the safety,so that the deep hole high sublevel stoping method with down fan was recommended.
作者 方偏桃 徐必根 袁梅芳 FANG Piantao;XU Bigen;YUAN Meifang(Changsha Institute of Mining Research Co.Ltd,Changsha,Hunan 410012,China;State Key Laboratory of Metal Mine Safety Technology,Changsha,Hunan 410012,China;Hunan Labour Protection Institute of Nonferrous Metals,Changsha,Hunan 410012,China)
出处 《矿业研究与开发》 CAS 北大核心 2018年第12期41-45,共5页 Mining Research and Development
关键词 大尺度采场 稳定性分析 数值模拟 FLAC3D Shrinkage method Large-scale mining stope Stability analysis Numerical Simulation FLAC3D
  • 相关文献

参考文献12

二级参考文献110

共引文献681

同被引文献17

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部