利用芦芽山布袋沟内马家寺泉和姑姑庵泉水,分析了水资源量、水质和泥沙后,修建截潜流设施,采取分级消能措施和蓄水设施,成功消减了490 m的水头落差,接入末端自来水管网,达到了设计要求。
Majiasi Spring and Gugu'an Spring in Bubaogou,Luya Mountain,were used to analyze the water resources,water quality and sediment.After construction of intercepting subsurface flow facilities,energy dissipation measures and water storage facilities were adopted,the head drop of 490 m was successfully reduced and the water supply network at the end was connected to meet the design requirements.
出处
《山西水利科技》
2018年第4期17-20,共4页
Shanxi Hydrotechnics
关键词
截潜流
调压池
集水廊道
滤水体
蓄水池
intercepting subsurface flow
pressure regulating pool
water catchment corridor
water filter
cistern