期刊文献+

分期汛限水位和设计洪水位的确定方法 被引量:21

Calculating Methods of Staged Limit Water Level in Flood Season and Design Flood Level
下载PDF
导出
摘要 提出用组合频率法和库水位法推求分期汛限水位和设计洪水位 ,并以广东新丰江为例 ,采用以上两种方法确定分期汛限水位和设计洪水位 ,为水库分期运用提供了可靠的依据 ,大大提高了新丰江水库的发电效益。 This paper suggests a frequency combination method and a reservoir level method to calculate both the staged limit water level in flood season and the design flood level. These methods are clear in frequency conception and practical in application. The paper applies the methods to the calculation of these two levels of Xinfengjiang Reservoir in Guangdong province and shows that the electricity generation benefit is greatly improved. The methods discussed in the paper can provide reliable basis for staged utilization of reservoirs.
出处 《水电能源科学》 2002年第1期21-23,共3页 Water Resources and Power
关键词 分期汛限水位 设计洪水位 staged limit water level in flood season design flood level staged utilization reservoir
  • 相关文献

参考文献3

二级参考文献1

共引文献9

同被引文献182

引证文献21

二级引证文献149

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部