摘要
本文在分析研究修建丹江口水库后汉江中游河床演变的基础上,提出了控导工程整治改造游荡河道的可能性.经概化模型试验研究表明,在较恶劣的来水来沙情况下,此类工程群的适应性和整治效果是好的.
The fluvial process of the middle braided reaches of the Hanjiang River after the construction of Danjiangkou Reservoir is analyzed in this paper. The controlling alignment engineering project may improve braided reaches . Based upon experimental results , the training effect of these engineering structures is satisfactory under serious flow and sediment conditions.
出处
《河海大学学报(自然科学版)》
CAS
CSCD
1989年第5期48-55,共8页
Journal of Hohai University(Natural Sciences)
关键词
河床演变
概化模型
游荡性河流
braided reaches
fluvial process
controlling alignment engineering project
node
general model