摘要
提出了大型火电机组优化检修的数学模型。介绍了大型火电机组优化检修的关键技术和检修周期的确定方法。给出了黄台发电厂大型火电机组计划大修间隔时间和计划大修停机时间的统计分析方法和结果。图 2表 1参
A mathematical model of maintenance majorization for large capacity fossil fired generating units of power station is pressented. The maintenance majoization technology and the determination method for optimizatioin time to maintenance of fossil fired generating units are given together with the statistical analysis method and results for time to planned overhaul and planned overhaul duration of large capacity fossil fired generating units for Huangtai Power Plant. Figs 2, table 1 and refs 5.
出处
《动力工程》
CSCD
北大核心
2001年第6期1477-1480,共4页
Power Engineering
关键词
火电机组
优化检修
可靠性
最佳检修周期
火力发电厂
大型
fossil fired generating units
maintenance majorization
reliability
optimization time to maintenance