期刊文献+

“一明二暗”“二明一暗”逆作法和顺作法深基坑挖土施工技术 被引量:7

REVERSE AND NORMAL CONSTRUCTION METHOD OF DEEP FOUNDATION PIT CUTTING OF "ONE OPEN EXCAVATING-TWO TUNNELING"AND "TWO OPEN EXCAVATING-ONE TUNNELING
下载PDF
导出
摘要 上海地铁河南中路站工程深基坑挖土采用特殊的逆作法、半逆作法和顺作法组合施工技术 ,通过地墙位移、支撑轴力、建筑物沉降等监测数据综合分析 ,结合深基坑施工时间和空间效应对位移的控制 ,制定技术措施 ,调整施工方案 ,确保了周边环境的安全。 Special reverse construction method,semi-reverse method and normal method were jointly adopted in deep foundation pit excavation of subway station He-nan-zhong-lu,Shanghai.Through analysis of surveyed parameter of retention wall replacement,supporting axis stress and building settlement,considering the impact of time and space on the replacement,proper technological measures were taken to adjust construction method,and the safety of surrounding buildings were well secured ultimately.
作者 周绍武
出处 《建筑技术》 北大核心 2002年第2期106-107,共2页 Architecture Technology
关键词 深基坑 逆作法 顺作法 时空效应 工程施工 deep foundation pit reverse construction method normal construction method time-space effect
  • 相关文献

同被引文献23

引证文献7

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部