三峡工程明渠提前截流方案及水力学试验研究 被引量:3

In-advance schemes and research findings for hydraulic test on TGP's 3rd-stage open-channel closure
下载PDF
导出
摘要 论述了三期明渠提前截流方案的综合比较分析及截流水力学试验研究成果。认为拟定的提前截流诸方案各有利弊 ,其截流难度较初设方案显著增加。对于截流“基本方案”及“比较方案”的成功实施 。 The in advance closure schemes and their reasearch findings on Three Gorges Project's (TGP's) 3rd stage open channel closure are discussed in the article. It is considered that there are some advantages and disadvantages for every closure scheme, but their construction difficulties obviously increase than the original scheme. For successfully implementing the basic scheme and comparative scheme ahead of time, some measures to decrease the difficulties of closure must be adopted.
出处 《长江科学院院报》 CSCD 北大核心 2001年第5期10-13,22,共5页 Journal of Changjiang River Scientific Research Institute
关键词 三峡工程 明渠封堵 提前截流 截流水力学 试验研究 Three Gorges Project open channel closure in advance closure scheme
  • 相关文献

参考文献1

同被引文献10

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部