三峡永久船闸中隔墩岩体利用与加固 被引量:3

UTILIZATION AND STRENGTHENING OF ROCK MASS OF DIVISION PIER AT TGP PERMANENT SHIPLOCK
下载PDF
导出
摘要 三峡永久船闸两线闸室间保留岩体隔墩方案因比全挖后回填混凝土方案经济而予采用,使得对保留岩体的加固成为一个关键问题。施工中遇到的中隔墩表层岩体裂缝、直立墙顶几何滑移块体等岩石力学问题通过现场动态设计,分别制定了详细的工程处理对策,大量监测数据表明,中隔墩的岩体利用与加固是成功和安全的. The reserved rock mass between two lines of TGP permanent ship lock is used as their division pier, which is obviously superior in economy to the scheme of removing the rock mass and constructing a concrete division pier at its location. The rock mechanics problems encountered in the course of excavating the lock chambers, such as cracking on the surface of reserved rock masse the potential movable rock blacks on the top of vertical excavated wall, and the large faults, were all salved through engineering treatment measures developed by field dynamic designs and the reserved rock mass is strengthened.
出处 《岩石力学与工程学报》 EI CAS CSCD 北大核心 2002年第2期268-272,共5页 Chinese Journal of Rock Mechanics and Engineering
关键词 船闸 中隔墩 动态设计 岩体 加固 shiplock, division pier, dynamic design, rock mass strengthening
  • 相关文献

参考文献5

  • 1长江水利委员会综合勘测局.永久船闸二闸室中隔墩地质条件及其对岩体变形和裂缝形成的影响分析[M].武汉:长江水利委员会综合勘测局,1999.. 被引量:1
  • 2水利部长江水利委员会.长江三峡水利枢纽永久船闸高边坡设计基本方案专题报告[M].武汉:水利部长江水利委员会,1994.. 被引量:2
  • 3周思孟主编..复杂岩体若干岩石力学问题[M].北京:中国水利水电出版社,1998:313.
  • 4水利部长江水利委员会.三峡工程永久通船建筑物研究[M].武汉:湖北科学技术出版社,1997.. 被引量:1
  • 5长江水利委员会长江三峡工程代表局.永久船闸高边坡及地下洞井稳定评价专题报告[M].武汉:长江水利委员会长江三峡工程代表局,1999.. 被引量:1

共引文献1

同被引文献54

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部