国家“九五”重点科技攻关项目 ,新城金矿复杂条件矿床采矿方法研究 ,在诸多工艺方案中确定盘区上向高分层连续回采充填采矿法作为试验方案 ,经过数年多部门多学科联合攻关 ,圆满完成任务 。
Study on mining methods of Xincheng complex condilioned deposit was a key technological project in the period of 9th '5 year plan'.The panel upward high slice successive stoping and filling was picked out as trial program from diverse tochnological programs.Through several years' common efforts of relevant departments and branches of learning concerned,the testing work of this program were fulfilled.It was appraised to reach advanced international level.
出处
《黄金》
CAS
2002年第1期17-21,共5页
Gold
基金
国家"九五"科技攻关项目 (95 -5 2 1-0 2 -0 2 )
关键词
岩金矿床
高发层
连续回采
盘区充填
充填采矿法
rock gold deposit
complex conditions
high slice
successive stoping
panel
filling