摘要
本文从施工的角度 ,介绍了斜拉桥施工控制的方法、现状。
From the viewpoint of construction of cable stayed bridges,the paper presents the methods for and present situation of the control of the construction of cable stayed bridges as well as factors affecting the control.The paper also presents the operational procedures and key points during the construction of cable stayed bridges.
出处
《中国港湾建设》
北大核心
2001年第5期34-37,共4页
China Harbour Engineering