上海外高桥电厂取、排水域中潮位下极限淤积估算 被引量:3

Estimation of Ultimate Sedimentation under the Mean Tidal Level in the Basin of Intake and Output of the Wai Gao Qiao Electric Power Plant (WEPP) in Shanghai
下载PDF
导出
摘要 上海外高桥电厂水域在一期工程建成后 ,发生严重淤积。二期工程的取、排水口布置 ,与该区域的淤积关系甚大。本文分析了该区域的淤积变化和淤积原因 ,并用经过验证的公式估算淤积后的水深 ,初步给出建码头区及取水口区的中潮位下极限淤积图形。 A serious deposition has been observed in the basin of the intake of the WEPP since its first stage was completed. The engineering layout of its second stage has a close relationship with sedimentation. After analyzing the reason of sedimentation in the basin, the ultimate sedimentation thickness and flow depth under the mean tidal level in the area of the intake of the second stage of the WEPP are estimated by the calibrated formulas.
作者 罗勇 罗肇森
出处 《泥沙研究》 CSCD 北大核心 2001年第5期67-72,共6页 Journal of Sediment Research
关键词 电厂 水域 淤积分析 极限淤积估算 上海 潮位 排水口 取水口 Basin of the power plant Sedimentation analyses Estimation of the ultimate sedimentation
  • 相关文献

参考文献13

  • 1陈惠泉.外高桥电厂取水口水域水下地形观测分析报告[M].中国水利水电科学研究院冷却水所,1999,1.. 被引量:1
  • 2罗肇森.河口航道开挖后的淤积计算[J].泥沙研究,1987,(2). 被引量:2
  • 3吴丽华 卢中一.上海外高桥续建顺岸式码头走向的试验研究[M].南京水利科学研究院河港研究所,1994,8.. 被引量:1
  • 4上海航道勘察设计研究院.外高桥港区一期工程码头前沿淤积研究报告[M].,1995,8.. 被引量:1
  • 5罗肇森 罗勇.外高桥电厂取排水域淤积分析及现期淤积估算[M].南京水利科学院研究院河港研究所,1991,2.. 被引量:1
  • 6蒋星科 罗肇森.外高桥电厂二期工程二维潮流泥沙数学模型计算分析研究[M].南京水利科学研究院河港研究所,2000,3.. 被引量:1
  • 7蒋星科,外高桥电厂二期工程二维潮流泥沙数学模型计算分析研究,2000年 被引量:1
  • 8罗肇森,外高桥电厂取排水域淤积分析及现期淤积估算,2000年 被引量:1
  • 9陈惠泉,外高桥电厂取水口水域水下地形观测分析报告,1999年 被引量:1
  • 10上海航道勘察设计研究院,外高桥港区一期工程码头前沿淤积研究报告,1995年 被引量:1