摘要
阐述了悬臂浇注施工法中支模标高的计算原理及前进分析与倒退分析二者之间的关系 .
The paper details the principle and method of mode l of bridge in construction,and the relation of analysis advance and back.The rele vant views and methods are given by the author.
出处
《重庆交通学院学报》
2001年第2期19-21,64,共4页
Journal of Chongqing Jiaotong University
关键词
施工控制
挠度计算
桥梁
悬臂浇注施工
支模标高
计算
control of construction
method of cantilever
construction of T-bridge
computer of deformation