介绍了宁波招宝山大桥主桥斜拉索挂设与拆除施工方法 。
The construction methods and the safety technological measures for the installation and dismantlement of the stay cables in the project of rehabilitation of Zhaobaoshan bridge in Ningbo are introduced.