摘要
介绍了龙游黄铁矿后塘土弄尾矿坝采用块石挤淤联合土工布排渗加筋处理软土地基的方法 ,提高软土的抗剪能力的措施 ,工程实施后 。
The method was introduced that by putting lump rock in the sludge and draining the seepage with geotextile, the soft foundation could be treated to improve its shearing resistance. The method was applied for Houtanglong tailing dam of Zhejiang Longyou pyrite mine, after the execution of the project, good economic benefits were obtained.
出处
《冶金矿山设计与建设》
2001年第3期10-12,共3页
Metal Mine Design & Construction