摘要
对开挖长度达 1km的广州市黄埔大道隧道工程 ,尝试使用全站仪进行监测 ,获得了理想的结果 .通过对全站仪变形监测的精度分析 。
In order to obtain perfect results in Huangpu Avenue tunnel construction in Guangzhou, the authors have tried to use total station for 1km tunnel construction monitoring. The paper analyzes the accuracy of total station monitoring, and concludes that it is an effective technology.
出处
《华南理工大学学报(自然科学版)》
EI
CAS
CSCD
北大核心
2001年第7期92-94,共3页
Journal of South China University of Technology(Natural Science Edition)