摘要
首次将预应力混凝土管桩作为抗拔桩应用在广东奥林匹克体育场地下室抗浮设计中。对预应力管桩的抗拔性能进行分析计算及现场拉拔试验 ,对桩型。
In the basement construction of the Guangdong Olympic Gym Center,the prestressed concrete pile is adopted as resistant extraction pile to resist buoyancy the first time.The analysis of this kind of structure with test in site is formulated.Some suggestions for selection of the type,end plate and concrete of pile are proposed.
出处
《建筑结构》
CSCD
北大核心
2001年第5期55-57,共3页
Building Structure
关键词
预应力混凝土
管桩
抗浮
抗拔
体育场
设计
prestressed concrete pile
resistant extraction
resistant buoyancy