摘要
DEA方法是评价具有多投入多产出决策问题相对有效性的有效方法。它不受指标性质和因次量的限制。本文利用该方法对矿井设计方案进行了评价和优选 。
DEA method is an effective method for evaluating the relative effectiveness of decision making problem with multi inputs and outputs.This method does not restrained by various index properties and dimensions.In this paper,it is used for evaluation and optimal selection of mine design plans and achieves very good results.
出处
《山东科技大学学报(自然科学版)》
CAS
2001年第1期29-33,共5页
Journal of Shandong University of Science and Technology(Natural Science)