介绍了瓦村水电站的工程概况,该电站是郁江综合利用规划的第2个梯级。论述了对水轮机的型式及主要参数的选择,从技术、经济方面对2×115 MW、3×76.6 MW、4×57.5 MW 3个方案进行定性、定量的分析比较及优化,并提出了推荐方案。
Wacun Hydropower Station is the 2nd cascade of Yujiang River Comprehensive Development Planning. Based on introduction of the general condition of the project, the author presented the selection of turbine type and main parameters. For determination of recommended scheme, three alternatives of 2 × 115MW, 3 × 76.6MW and 4 × 57.5MW had been compared in respects of technical and economic indexes, including qualitative and quantitative analysis, comparison and optimization.
出处
《广西水利水电》
2014年第3期44-46,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
水轮机
选型设计
方案比较
瓦村水电站
Turbine
selection of type
comparison of alternatives
Wacun Hydropower Station