摘要
商丘污水处理厂二期工程规模为10×104m3/d,采用改良AAO反应池/D型滤池三级污水处理工艺。介绍其主要建、构筑物的设计参数。实际运行表明出水水质达到《城镇污水处理厂污染物排放标准》(GB 18918-2002)的一级A标准。
The capacity of Shangqiu Wastewater Treatment Plant(WWTP) Phase II Project is 10×104m3/d with the three-level sewage treatment technology of the modified AAO reaction tank and D-shaped filter. The article introduces the design parameters of its main buildings and structures. The practical operation shows that the effluent quality meets the first level A standard of Discharge Standard of Pollutions from Municipal Wastewater Treatment Plant(GB 18918-2002).
出处
《城市道桥与防洪》
2014年第6期187-189,17,共3页
Urban Roads Bridges & Flood Control