3Yellishetty M, Mudd G M. Substance flow analysis of steel and long term sustainability of iron ore resources in Australia, Bra- zil, China and India [J]. Journal of Cleaner Production, 2014, 84:400 - 410. 被引量:1
4Bulut E, Duru O, Keqeci T, et al. Use of consistency index, ex- pert prioritization and direct numerical inputs for generic fuzzy-AHP modeling: A process model for shipping asset management [J]. Expert Systems with Applications, 2012, 39(2): 1 911 - 1 923. 被引量:1
5Duru O. A multivariate model of fuzzy integrated logical fore- casting method (M-FILF) and multiplicative time series clus- tering: A model of time-varying volatility for dry cargo freight market[J].Expert Systems with Applications, 2012,39(4): 4 135 -4 142. 被引量:1
6Duru O. A fuzzy integrated logical forecasting model for dry bulk shipping index forecasting: An improved fuzzy time series approach. [J]. Expert Systems with Applications, 2010, 37(7): 5 372 - 5 380. 被引量:1
7Ko B W. Analysis of Term Structure in Dry Bulk Freight Market [ J ]. Asian Journal of Shipping & Logistics, 2013,29(1): 1 - 22. 被引量:1
8David Menzie, Pui - Kwan Tse, Mike Fenton. U. S. Geological Survey : China's Growing Appetite for Minerals[R]. 2004. 被引量:1
9Whrell L. The effect of a change in pricing regime on iron ore prices[J]. Resources Policy,2014,41 : 16 - 22. 被引量:1
10Lenegan C, Beck T, Gray M. The Economic Significance of Re- sources and Energy Trade [ J ]. Growth, 2005,55 : 36 - 47. 被引量:1