摘要
通过分析既有杭州枢纽现状、存在问题,研究了杭州枢纽客运专线引入杭州枢纽客运系统总图规划。针对杭州枢纽沪杭、宁杭杭甬客运专线开通工程现状,结合枢纽总图客运系统规划、客运运输径路、客运站办理作业,研究了杭长客运专线引入杭州枢纽杭州南站3个施工过渡方案,推选方案满足施工过渡期间枢纽客运通过能力,减少施工过渡次数,保证各引入线路径畅通和点线能力配套,为客运专线引入大型枢纽施工过渡提供借鉴。
By analyzing the current situation and problems in the Hangzhou railway terminal, this study researched the general planning for the Hangzhou-Changsha passenger railway line entering the passenger transport system of the Hangzhou railway terminal. Focusing on the project status of the Hu-Hang, Ning- Hang, Hang-Yong railway passenger dedicated lines in the Hangzhou railway terminal, combining with the general planning in terms of passenger transportation system, passenger transportation path, passenger station operation in the terminal, this study researched three construction transition plans for Hangzhou- Changsha passenger railway line entering the Hangzhou railway terminal. As a result, the recommended plan can meet the passenger transport capacity requirement of the terminal during the construction transition, can reduce construction transition times, and can ensure that the paths of all incoming lines are unblocked and the production capacities of all the process are well matched with each other. This study can serve as a reference for construction transition when railway passenger dedicated line entering a big railway terminal.
出处
《铁道标准设计》
北大核心
2014年第7期24-29,共6页
Railway Standard Design
关键词
客运专线
杭州铁路枢纽
铁路客站
施工过渡
passenger dedicated line
Hangzhou railway terminal
railway passenger station
construction transition