摘要
从施工前准备工作、施工过程、后期管理三个阶段对冬期混凝土施工的质量控制进行了探讨,着重介绍了冬期混凝土浇筑过程中坍落度的检测、出罐温度的控制、配合比设计等工序施工要点,以确保混凝土的质量。
This paper discussed the quality control of concrete construction in winter from preparation work before construction, construction process, late management three stages, emphatically introduced the slump detection, pot temperature control, mix rated design and other construction process construction key points of concrete pouring in winter, in order to ensure the concrete quality.
出处
《山西建筑》
2014年第18期240-241,共2页
Shanxi Architecture
关键词
混凝土
质量控制
施工
温度
concrete
quality control
construction
temperature