浅析黔中水利平寨水电站钢岔管质量控制 被引量:2

Analysis of Qianzhong Water Conservancy Pingzhai Hydropower Station Steel Bifurcated Pipe Quality Control
下载PDF
导出
摘要 平寨水电站岔管制作及安装,通过对WDB620高强钢岔管原材料的检测和生产性工艺试验及评定,加强了过程控制,并根据振动时效应和第三方检测单位的检测和评价意见,组织召开了岔管免做水压试验专家论证会,为工程节省工期和降低费用提供决策依据,保证了岔管质量。 Process control is strengthened through detection on WDB620 high-strength steel bifurcated pipe raw materials as well as production process test and evaluation aiming at bifurcated pipe fabrication and installation in Pingzhai hydropower station.Bifurcated pipe hydrostatic test exemption expert discussion meeting is organized and convened according to vibration aging effect as well as detection and evaluation opinions of a third detection unit,thereby providing decision-making basis for saving construction duration and lowering cost in the project,and ensuring bifurcated pipe quality.
出处 《中国水能及电气化》 2014年第5期29-33,共5页 China Water Power & Electrification
关键词 平寨水电站 钢岔管 质量控制 Pingzhai hydropower station steel bifurcated pipe quality control
  • 相关文献

参考文献4

共引文献7

同被引文献7

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部