期刊文献+

Resource Scheduling Algorithm and Ecnomic Model in ForCES Networks

Resource Scheduling Algorithm and Ecnomic Model in ForCES Networks
下载PDF
导出
摘要 Resource scheduling algorithm for ForCES(Forwarding and Control Element Separation) networks need to meet the flexibility,programmability and scalability of node resources.DBC(Deadline Budget Constrain) algorithm relies on users select cost or time priority,then scheduling to meet the requirements of users.However,this priority strategy of users is relatively simple,and cannot adapt to dynamic change of resources,it is inevitable to reduce the QoS.In order to improve QoS,we refer to the economic model and resource scheduling model of cloud computing,use SAL(Service Level Agreement) as pricing strategy,on the basis of DBC algorithm,propose an DABP(Deadline And Budget Priority based on DBC) algorithm for ForCES networks,DABP combines both budget and time priority to scheduling.In simulation and test,we compare the task finish time and cost of DABP algorithm with DP(Deadline Priority) algorithm and BP(Budget Priority) algorithm,the analysis results show that DABP algorithm make the task complete with less cost within deadline,benifical to load balancing of ForCES networks. Resource scheduling algorithm for ForCES (Forwarding and Control Element Separation) networks need to meet the flexibility, programmability and scalability of node resources. DBC (Deadline Budget Constrain) algorithm relies on users select cost or time priority, then scheduling to meet the requirements of users. However, this priority strategy of users is relatively simple, and cannot adapt to dynamic change of resources, it is inevitable to reduce the QoS. In order to improve QoS, we refer to the economic model and resource scheduling model of cloud computing, use SAL (Service Level Agreement) as pricing strategy, on the basis of DBC algorithm, propose an DABP (Deadline And Budget Priority based on DBC) algorithm for ForCES networks, DABP combines both budget and time priority to scheduling. In simulation and test, we compare the task finish time and cost of DABP algorithm with DP (Deadline Priority) algorithm and BP (Budget Priority) algorithm, the analysis results show that DABP algorithm make the task complete with less cost within deadline, benifical to load balancing of ForCES networks.
出处 《China Communications》 SCIE CSCD 2014年第3期91-103,共13页 中国通信(英文版)
基金 This work was supported in part by a grant from the National Basic Research Program of China(973 Program) under Grant No.2012CB315902,the National Natural Science Foundation of China under Grant No.61379120,61170215,the Program for Zhejiang Leading Team of Science and Technology Innovation under Grant No.2011R50010-12,2011R50010-18.Zhejiang Provincial Key Laboratory of New Network Standards and Technologies (NNST)
关键词 ForCES networks economicmodel cloud computing resource scheduling ForCES 调度算法 调度模型 资源 网络 服务水平协议 BP算法 时间优先
  • 相关文献

参考文献1

二级参考文献22

  • 1王洛欣,申卫昌,朱莉明,陈靓.先进的通信计算机架构ATCA及应用研究[J].科学技术与工程,2006,6(14):2132-2134. 被引量:8
  • 2杨晓辉,戴紫彬.一种基于FPGA的可重构密码芯片的设计与实现[J].电子技术应用,2006,32(8):102-105. 被引量:11
  • 3National Science Foundation. The GENI Initiative [ EB/ OL]. [ 2006 - 12 -20 ]. http://www, nsf. gov/cise/geni/. 被引量:1
  • 4Find ( Fucture Internet Network design) [ EB/OL ]. [ 2006 -06 -01 ]. http ://find. isi. edn. 被引量:1
  • 5ITU-T. Next Generation Network Global Standards Initia- tive (NGN-GSI) [EB/OL]. [2006 - 12 -20]. http://www, itu. int/ITU-T/ngn/. 被引量:1
  • 6Bavier A, Huang M, Peterson L. An Overlay Data Plane for PlanetLab [ C ]//Proc. Advanced Industrial Conference on Telecommunications, 2005:8 - 14. 被引量:1
  • 7Operating Systems Review [ C ]// Proceedings of the 17th Symposium on Operating Systems Principles, 1999:217 -231. 被引量:1
  • 8Scott Karlin, Larry Peterson. VERA: An Extensible Router Architecture [ C ]//IEEE OPENARCH, 2001 : 3 -14. 被引量:1
  • 9Uday Naik, Alex Shoykhet, Larry Huston, et al. IXA Portability Framework :Preserving Software Investment in Network Processor Applications [ J ]. Intel Technology Journal, 2002, 6 (3) : 50 - 60. 被引量:1
  • 10Building a Multiserviee Platform for the Future [ EB/ OL]. [ 2008 - 06 - 01 ] . http ://www. cisco, com/en/ US/pro ducts/hw/switches/ps1925/products white_paper09186a00800887ad, shtml. 被引量:1

共引文献24

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部