摘要
从项目的组织构架、技术审核、项目监理、质量控制等方面深入探讨了广州市二等水准网建设项目的组织与管理,通过监理机制引入、周期性沟通协调、核查项目投入等有效手段实现了项目的精细化管理,使项目进度和质量得到了充分保障,并顺利完成任务,对财政资金测绘项目的管理具有借鉴作用。
This article discussed how to organize and manage the project of building the second -grade leveling network of Guangzhou City from the perspectives of the organizational structure , technical verification , project supervision , and quality control .The progress and the quality of the project were fully guaranteed with the introduction of supervision mechanism , regular communication and coordi-nation , the scrutiny of project investment and other effective measures , which can be well referred to when managing currently fiscal -financed surveying and mapping projects .
出处
《测绘与空间地理信息》
2014年第4期177-179,共3页
Geomatics & Spatial Information Technology
关键词
二等水准
精细化管理
项目监理
second-grade leveling
delicacy management
project supervision