期刊文献+

超深地下连续墙施工重难点以及应对措施 被引量:7

Key difficulty and response measures of the ultra-deep diaphragm wall
下载PDF
导出
摘要 随着地下空间开发应用的大力发展,基坑开挖的深度在逐渐加深,导致基坑围护的深度也在逐步加深,超深地下连续墙正是解决超深基坑安全围护的关键工艺。文章结合施工经验对超深地下连续墙的施工重难点以及应对措施进行总结。实践表明改进后的施工工艺是有效的。 With the vigorous development and application of underground space, the depth of excavation is gradually deepened, which led to foundation pit depth is gradually deepened, ultra-deep diaphragm wall is the critical process to solve the safe containment of deep foundation. This paper summarizes the key difficulty and response measures of ultra-deep diaphragm wall construction. Practice shows that the improved construction technology is effective.
作者 梁艳文
出处 《中国港湾建设》 2014年第4期46-49,共4页 China Harbour Engineering
关键词 超深 地下连续墙 重难点 应对措施 ultra-deep diaphragm wall key difficulty response measures
  • 相关文献

参考文献3

  • 1丛蔼森编著..地下连续墙的设计施工与应用[M].北京:中国水利水电出版社,2001:1248.
  • 2余永祯,林婉华,胡永旭,等.建筑施工手册[M].第3版.北京:中国建筑工业出版社,1999. 被引量:1
  • 3龚晓南主编..深基坑工程设计施工手册[M].北京:中国建筑工业出版社,1998:811.

同被引文献28

引证文献7

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部