为了解决由丘陵山区填谷造地形成的工业建设场地,场地回填面积大、填土厚而且不均匀的难题,在福建紫金铜业建设场地中采用组合锤法地基处理技术,处理后的地基满足建构筑物承载力和沉降控制设计要求,经济效益显著,实现了地基处理和基础设计的完美结合,为填谷造地场地的地基处理提供了一种高效、低碳、节能、环保的方法。
In order to solve the difficulty that the backfilling area of site is large and the filling is thick and non-uniform in the industrial construction site formed by valley filling and land reclamation in the hilly and mountainous area, the foundation treatment technology with combined hammering method is adopted in the construction site of Purple Cooper Industry in Fujian, the foundation after being treated meets the requirements of bearing force for buildings (structures) and settlement control design, with remarkable economic benefit, so as to realize the perfect combination between foundation treatment and foundation design as well as provide a high-efficient, energy-saving and environment-friendly method for foundation treatment of valley filling and land reclamation site.
出处
《有色冶金设计与研究》
2014年第2期37-39,共3页
Nonferrous Metals Engineering & Research
关键词
填谷造地
地基处理
组合锤
节能环保
沉降控制
valley filling and land reclaiming
ground foundation treatment
combined hammer
energy saving and environmental protection
settling control