期刊文献+

钢筋混凝土拱极限承载力研究综述 被引量:8

A state-of-the-art on the ultimate load-carrying capacity of reinforced concrete arches
原文传递
导出
摘要 对等效梁柱法和极限分析法进行对比分析.结果表明:极限分析法可充分考虑超静定拱结构的承载能力,可用于评估结构在罕遇地震、旧桥加固或超限荷载运输情况下的承载能力;等效梁柱法更符合实际桥梁的受力状况,被大量的规范所采用.与美国和日本桥梁设计规范不同的是,我国的《公路钢筋混凝土及预应力混凝土桥涵设计规范(JTG D62-2004)》和《公路圬工桥涵设计规范(JTG D61-2005)》中,在将拱比拟成等效梁柱时,没有考虑矢跨比的影响. In this paper, limit analysis method and equivalent beam - column method are analyzed and compared, some ideas can be summarized as the following: limit analysis method can take full account of the ultimate load - carrying capacity of the statically indeterminate arch structure, which can be used for evaluation of the bearing carrying capacity of the structures under special situation, such as rehabilitation of an existed bridge, in case of an overload transportation or a rarely met earthquake; equivalent beam-column method, which is in accordance with the actual bridge more, has been adoptedby a lot of codes ; unlike the bridge design codes of the United States and the Japan, the influ-enee of the span - to - rise ratio of the arch to its ultimate load - carrying capacity has not been consid-ered when an arch is stimulated into a beam-column in the China design code for highway masonry bridges and culverts (JTG D62-2004 ) and the Design code for highway reinforced concrete and prestressed concrete bridges and culverts ( JTG D61 - 2005 ).
出处 《福州大学学报(自然科学版)》 CAS CSCD 北大核心 2014年第2期282-289,共8页 Journal of Fuzhou University(Natural Science Edition)
基金 交通部西部交通建设科技项目(2008-318-00013)
关键词 钢筋混凝土拱 承载力 模型试验 数值分析 极限分析法 等效梁柱法 reinforced concrete arch load hearing capacity model test numerical analysis limitanalysis method equivalent beam-column method
  • 相关文献

参考文献42

  • 1陈宝春,叶琳.我国混凝土拱桥现状调查与发展方向分析[J].中外公路,2008,28(2):89-96. 被引量:72
  • 2韦建刚,陈宝春.国外大跨度混凝土拱桥的应用与研究进展[J].世界桥梁,2009,37(2):4-8. 被引量:27
  • 3Lin Shang - shun, Chen Bao - chun, Wu Qing - xiong. Discussion on calculation methods for load bearing capacity of concrete arch bridge[ C ]//Fourth International Conference on Digital Manufacturing and Automation. 2013:492 -496. 被引量:1
  • 4中华人民共和国交通部.JTGD62-2004公路钢筋混凝土及预应力混凝土桥涵设计规范[S].北京:人民交通出版社,2004. 被引量:146
  • 5中华人民共和国交通部.JTGD61-2005公路圬工桥涵设计规范[S].北京:人民交通出版社,2005. 被引量:10
  • 6Ronca P, Cohn M Z. Limit analysis of reinforced concrete arch bridges[J]. Journal of Structural Division, 1979, 106(10) : 313 -326. 被引量:1
  • 7郑振飞,张尚杰,彭大文,等.钢筋混凝土拱的极限承载能力试验研究[J].福州大学学报:自然科学版,1982(2):79-90. 被引量:3
  • 8郑振飞 彭大文.超静定钢筋混凝土拱的非线性分析.福州大学学报:自然科学版,1985,(2):116-127. 被引量:3
  • 9陈克济.钢筋混凝土拱桥面内承载力的非线性分析[J].桥梁建设,1983(1):24-36. 被引量:3
  • 10陈宝春.钢筋}昆凝土无铰拱非线性平面有限元分析[D].福州:福州大学,1986. 被引量:1

二级参考文献78

共引文献351

同被引文献76

引证文献8

二级引证文献39

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部