摘要 西部地区某煤矿副斜井富水黄土浅埋段施工中,发生了冒顶事故,难于处理。冒顶处斜长581.2m,距地面垂直距离约为48.5m。根据具体情况,采用壁后注浆堵水、工作面冒落区注浆充填加固等技术进行处理,取得了成功,使掘进工作得以安全顺利地进行。壁后注浆所用浆液主要为水泥-水玻璃双液浆,工作面冒落区注浆所用浆液为聚氨酯。现井筒已通过冒落段,进入正常段施工。 In a construction of a mine inclined shaft at the shallow depth of watery loess section of a mine in Western China ,a roof falling accident was occurred and was hard to handle .A inclined length of the roof falling area was 581 .2m and a vertical depth to the surface ground was 48.5m.According to the certain conditions ,a backfill grouting to seal water and a grouting backfilling and reinforcement to the roof falling area of the heading face and other technology were applied to handle the roof falling . The grouting and reinforcement were successful and the inclined shaft heading were safety and suc-cessfully conducted .The grout for the backfill grouting were mainly the cement-sodium silicate double grout and the grout for the grouting in the roof falling area of the heading face was polyurethane .The mine incline shaft was passed through the roof falling area and was in a normal construction.
出处 《建井技术》 2014年第1期36-39,共4页 Mine Construction Technology
基金 大同煤矿集团项目:千万吨矿井群复杂地层建井关键技术及数字矿山信息化研究(HTGJZB-TM1307303-2)
关键词 富水黄土 斜井 冒顶 注浆 超前管棚 watery loess mine inclined shaft roof falling grouting advance tubing shield
  • 相关文献

参考文献4

二级参考文献6

共引文献18

同被引文献7

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部