摘要
我国海上风力发电行业进入"加速期"。文章介绍了不同类型的海上风机基础型式、海上风机安装方式。研究了两种施工方案所需要的施工周期,并对我国的海上施工能力(如:打桩、起吊设备及船舶)做出了分析。
Off-shore wind-power industry in China has come into a "boost--up" period. This paper introduces several kinds of foundation structures and erraction of off-shore windturbine and two ways of erraction of wind turbine.This studies the congstruction period and also analyze the construction capability(e.g.hammering and hoisting equipment and ships)of off--shore windfarm in China.