期刊文献+

LNG气化器平面布置及其管道设计 被引量:5

Equipment layout and piping design for LNG vaporizers
下载PDF
导出
摘要 液化天然气(LNG)气化器是接收站气化系统的关键设备,介绍了SCV和ORV两种类型的LNG气化器及各自特点。阐述了国内外接收站工程设计标准规范中,关于气化器平面布置的原则和管道设计中应遵循的原则和应注意的问题。介绍了气化器设备布置对安全间距的要求,分析了气化器工艺流程对阀门设置的要求,从管道材料、柔性设计和保冷结构三方面说明了LNG低温管道设计的特点,从管道设计方面和LNG泄漏收集措施两方面对气化器装置区防泄漏措施进行了分析总结。给出了两种气化器的平面布置方案,并对管道设计注意事项进了总结。 LNG vaporizers are the key equipments in vaporization facility of LNG receiving terminal. The characteristics of SCV and ORV are introduced. The principles in the applicable codes and standards which should be followed in the engineering design of LNG receiving terminals both in China and abroad are described. The requirements for vaporizer safety spacing are introduced. The requirement of vaporizer process on the valve layout is analyzed. The LNG cryogenic piping design is studied in respect of piping material, flexibility design, and cold insulation. The measures for leaking prevention in vaporizer area are considered in the design. Plot plans for SCV and ORV are illustrated and some precautions and considerations are reviewed.
作者 李永进
出处 《炼油技术与工程》 CAS 2014年第3期36-39,共4页 Petroleum Refinery Engineering
关键词 平面布置 低温管道设计 LNG, SCV, ORV, equipment layout, cryogenic piping design
  • 相关文献

参考文献8

二级参考文献14

  • 1陈雪,马国光,谢剑飞.LNG长输管道输送技术研究[J].石油化工设计,2006,23(2):56-58. 被引量:15
  • 2ASTM A553/A553M Standard Specification for Pressure Vessel Plates,Alloy Steel,Quenched and Tempered 8 and 9 Percent Nickel[S].2006. 被引量:1
  • 3ASTM A403/A403M Standard Specification for Wrought Austenitic Stainless Steel Piping Fittings[S].2004. 被引量:1
  • 4周修杰.2010-2015年中国液化天然气(LNG)行业投资分析及前景预测报告[R].北京:中投顾问产业研究中心.2010. 被引量:1
  • 5陈永东.浙江LNG项目接收站气化器专项研究报告[R].合肥通用机械研究院,2006. 被引量:1
  • 6《非表面加工用预制刚性泡沫聚异氰酸酯绝热材料规范》(ASTMC591). 被引量:1
  • 7《石油化工设备和管道隔热技术规范》(SH3010). 被引量:1
  • 8Permanent Technical Study Group of GIIGNL. Lng Incident identification[EB/OL]. 2002. http://www.Ingterminalinfo.org. 被引量:1
  • 9National Fire Protection Association. Production, storage, and handling of iiquefied natural gas[S].NFPA59A,2001 Edition.NFPA. Quincy,MA. 被引量:1
  • 10DALE ZINN C. LNG Codes and Process Safety[J].Process Safety Progress ,2005,24(3) : 158-168. 被引量:1

共引文献97

同被引文献30

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部