期刊文献+

Hybrid constructed wetlands for highly polluted river water treatment and comparison of surface-and subsurface-flow cells 被引量:14

Hybrid constructed wetlands for highly polluted river water treatment and comparison of surface-and subsurface-flow cells
原文传递
导出
摘要 A series of large pilot constructed wetland (CW) systems were constructed near the confluence of an urban stream to a larger fiver in Xi'an, a northwestern megacity in China, for treating polluted stream water before it entered the receiving water body. Each CW system is a combination of surface- and subsurface-flow cells with local gravel, sand or slag as substrates and Phragmites australis and Typha orientalis as plants. During a one-year operation with an average surface loading of 0.053 m3/(m2.day), the overall COD, BOD, NH3-N, total nitrogen (TN) and total phosphorus (TP) removals were 72.7% ~ 4.5%, 93.4% + 2.1%, 54.0% + 6.3%, 53.9% ~ 6.0% and 69.4% :t: 4.6%, respectively, which brought about an effective improvement of the fiver water quality. Surface-flow cells showed better NH3-N removal than their TN removal while subsurface-flow cells showed better TN removal than their NH3-N removal. Using local slag as the substrate, the organic and phosphorus removal could be much improved. Seasonal variation was also found in the removal of all the pollutants and autumn seemed to be the best season for pollutant removal due to the moderate water temperature and well grown plants in the CWs. A series of large pilot constructed wetland (CW) systems were constructed near the confluence of an urban stream to a larger fiver in Xi'an, a northwestern megacity in China, for treating polluted stream water before it entered the receiving water body. Each CW system is a combination of surface- and subsurface-flow cells with local gravel, sand or slag as substrates and Phragmites australis and Typha orientalis as plants. During a one-year operation with an average surface loading of 0.053 m3/(m2.day), the overall COD, BOD, NH3-N, total nitrogen (TN) and total phosphorus (TP) removals were 72.7% ~ 4.5%, 93.4% + 2.1%, 54.0% + 6.3%, 53.9% ~ 6.0% and 69.4% :t: 4.6%, respectively, which brought about an effective improvement of the fiver water quality. Surface-flow cells showed better NH3-N removal than their TN removal while subsurface-flow cells showed better TN removal than their NH3-N removal. Using local slag as the substrate, the organic and phosphorus removal could be much improved. Seasonal variation was also found in the removal of all the pollutants and autumn seemed to be the best season for pollutant removal due to the moderate water temperature and well grown plants in the CWs.
出处 《Journal of Environmental Sciences》 SCIE EI CAS CSCD 2014年第4期749-756,共8页 环境科学学报(英文版)
基金 supported by the National Natural Science Foundation of China(No.50838005,51021140002) the Program for Innovative Research Team in Shaanxi(No.2013KCT-13)
关键词 constructed wetland surface-flow subsurface-flow polluted river water treatment constructed wetland surface-flow subsurface-flow polluted river water treatment
  • 相关文献

参考文献1

二级参考文献30

  • 1Arias C A,Del Bubba M,Brix H,2001. Phosphorus removal bysands for use as media in subsurface flow constructed reedbeds. Water Research,35(5): 1159-1168. 被引量:1
  • 2Bodelier P L E,Libochant J A,Blom C W P M,LaanbroekH J,1996. Dynamics of nitrification and denitrificationin root-oxygenated sediments and adaptation of ammonia-oxidizing bacteria to low-oxygen or anoxic habitats.Applied and Environmental Microbiology,62(11): 4100-4107. 被引量:1
  • 3Braskerud B C,2002. Factors affecting phosphorus retention insmall constructed wetlands treating agricultural non-pointsource pollution. Ecological Engineering,19(1): 41-61. 被引量:1
  • 4Brix H,1997. Do macrophytes play a role in constructedtreatment wetlands? Water Science and Technology,35(5):11-17. 被引量:1
  • 5Bu H M,Tan X,Li S Y,Zhang Q F,2010. Temporal and spatialvariations of water quality in the Jinshui River of the SouthQinling Mts.,China. Ecotoxicology and EnvironmentalSafety,73(5): 907-913. 被引量:1
  • 6Calheiros C S C,Rangel A O S S,Castro P M L,2007. Construct-ed wetland systems vegetated with different plants appliedto the treatment of tannery wastewater. Water Research,41(8): 1790-1798. 被引量:1
  • 7De-Bashan L E,Bashan Y,2004. Recent advances in removingphosphorus from wastewater and its future use as fertilizer(1997-2003). Water Research,38(19): 4222-4246. 被引量:1
  • 8Fraser L H,Carty S M,Steer D,2004. A test of four plant speciesto reduce total nitrogen and total phosphorus from soilleachate in subsurface wetland microcosms. BioresourceTechnology,94(2): 185-192. 被引量:1
  • 9Greenway M,2005. The role of constructed wetlands in sec-ondary effluent treatment and water reuse in subtropical andarid Australia. Ecological Engineering,25(5): 501-509. 被引量:1
  • 10Guo L,2007. Ecology-Doing battle with the green monster ofTaihu Lake. Science,317(5842): 1166. 被引量:1

共引文献37

同被引文献188

引证文献14

二级引证文献85

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部