大贾庄铁矿跨河大桥桩基偏位的处理方法 被引量:1

Processing Method on Pile Foundation Deviation of Dajiazhuang Iron Ore River Crossing Bridge
下载PDF
导出
摘要 根据大贾庄铁矿跨河大桥4号墩4-1#桩基偏位处理工程实例,针对桥梁桩基施工中产生的桩基偏位问题,通过计算桩基偏位受力情况,采用在4-2#和4-3#桩基增加连梁的处理方法,改善了偏位桩基偏心受力不利的影响,达到了在较短的工期内,安全、经济地处理好偏位桩基的目的。 According to the engineering examples of the treatment to Dajiazhuang iron ore river crossing bridge No.4 pier of 4-1# pile foundation deviation, in view of the problem of pile foundation deviation in construction of bridge, through the calculation of pile foundation deviation stress, the paper adopts a meth- od of increasing coupling beam with 4-2# and 4-3# foundation, which improves the adverse effect of ec- centric force of deviation pile, achieves the purpose of safety and economic treatment of the pile deviation in a short time.
作者 彭静美
出处 《交通标准化》 2014年第8期76-78,共3页 Communications Standardization
关键词 跨河大桥 桩基偏位 受力 处理方法 river crossing bridge pile foundation deviation stress processing method
  • 相关文献

参考文献3

  • 1JTGD62-2004,钢筋混凝土及预应力混凝土桥涵设计规范[S]. 被引量:1
  • 2JTGD63-2007,公路桥涵地基与基础设计规范[S]. 被引量:443
  • 3JTGD60-2004.公路桥涵设计通用规范[S].[S].,.. 被引量:1583

共引文献1926

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部