期刊文献+

沈阳市北海街28中学人行天桥托梁换柱改造方案的确定 被引量:1

The Confirmation of Modification Scheme of Trimmer Beam Column Changing of Pedestrian Overcrossing near No. 28 Middle School on Beihai Road Shenyang
下载PDF
导出
摘要 以沈阳市东一环高架桥建设经过的一个重要节点—一座已建成的人行天桥为工程背景,介绍了为配合高架桥建设移动其主桥桥墩,进行托梁换柱的合理改造方案的确定。 The thesis takes a built - up pedestrian overcrossing which is an important node that the Viaduct of East First Ring has passed as engineering background. To complete the viaduct, the main bridge pier has to be moved. Thus a reasonable modification scheme of relocating its column while keeping the trimmer beam stable has to be confirmed and the thesis gives a comprehensive analysis on it.
作者 王妍
出处 《北方交通》 2014年第3期55-58,共4页 Northern Communications
关键词 高架桥 人行天桥 主桥桥墩 托梁换柱 改造方案 Viaduct Pedestrian overcrossing Main bridge pier Trimmer beam column changing Modification Scheme
  • 相关文献

参考文献4

  • 1刘玉擎..组合结构桥梁[M],2005.
  • 2李星荣等编著..钢结构连接节点设计手册 第2版[M].北京:中国建筑工业出版社,2005:531.
  • 3吴冲主编..现代钢桥 上[M].北京:人民交通出版社,2006:279.
  • 4黄侨主编..桥梁钢-混凝土组合结构设计原理[M].北京:人民交通出版社,2004:206.

同被引文献3