期刊文献+

武定6.5级地震孕震过程测震学特征

Seismic Features of Seismogenic Process for the M6.5 Wuding Earthquake
下载PDF
导出
摘要 研究了 1995年 10月 2 4日云南省武定 6 5级强震前的地震活动性参数、空间分布图象、距震中 135km的巧家台振幅比、波速比演化特征 ,结果表明武定 6 5级地震孕育发生有明显的阶段性变化 ,经历了早期(1988年 4月~ 1992年 7月 ) ,中期 (1992年 8月~ 1995年 3月 ) ,晚期 (1995年 4月~ 1995年 10月 )阶段的发展 ,最终发生了强震。最后应用岩石破裂实验结果 ,分析了武定 6 5级地震孕震过程。 This paper studies the seismicity parameter,space distribution pattern and amplitude ratio and Vp/Vs ratio from Qiaojia station 135 km from the epicenter before strong the Wuding earthquake with M6 5 on October 24,1995 in Yunnan Province.The results show that prepatation and occurrence of the Wuding Earthquake with M6 5 went through a clear stage variation,the early stage (from April,1988 to July,1992),the middle stage (from August,1992 to March,1995),late stage (from April,1995 to October,1995)and final earthquake occurrence.Lastly,the seimogenic process for the Wuding earthquake with M6 5 is analyzed through using the experiment results of rock rupture.
作者 毛德培
机构地区 大姚县地震局
出处 《地震研究》 CSCD 北大核心 2001年第1期82-87,共6页 Journal of Seismological Research
关键词 孕震过程 地震活动性 振幅比 波速比 孕震期 应力场 武定6.5级地震 Seismogenic process seismicity amplitude ratio Vp/Vs ratio the Wuding earthquake
  • 相关文献

参考文献16

二级参考文献20

共引文献37

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部