摘要
九钢3号高炉因炉缸烧穿而被迫停炉大修,通过制定详细、可行的开炉方案实现了安全、顺利开炉生产,点火开炉至正常生产只用了4天时间,为萍钢高炉炼铁历史上最成功的一次开炉。
No. 3 blast furnace was forced to stop for overhaul because of the hearth burning through in Jiujiang Steel. Safe and smooth blowing - in are realized through detailed and feasible blow - in scheme . It only take four days from start - up to normal production. It is one of a successful safe and successful start - up of furnace in the history of Pingxiang Steel.
出处
《江西冶金》
2014年第1期17-20,共4页
Jiangxi Metallurgy
关键词
高炉炼铁
开炉准备工作
开炉过程控制
blast furnace ironmaking
preparation for blow - in
process control for blow - in