摘要 针对真金万水库溢洪道出口水流流速快、冲刷右岸边坡的问题,通过水工模型试验研究,取消了原设计方案中阶梯溢洪道下游消力池,而在溢洪道末端增设扭曲挑坎,并对扭曲坎进行优化,提出了利用两边直线段加中间小圆弧斜切挑坎的扭曲坎体形,获得了较好的水舌分散效果和入流流态。推荐方案的试验结果表明:阶梯+扭曲挑坎联合消能方案能够很好地解决真金万水库溢洪道的消能防冲问题,且阶梯和扭曲坎自身结构安全满足工程要求。 Aiming at settling the issue of high velocity of Zhenjinwan Reservoir spillway outlet and the scour of the right side slope of downstream river caused by the plunging flow,we abolished the stilling pool downstream of the spillway and instead set a skew bucket which was chamfered with straight lines on the two sides and a small arc in the middle was increased at the end of the spillway based on hydro-model test. Our test on the rec-ommendation scheme shows that the"steps and skew bucket" joint energy dissipation is a good solution to the Zhenjinwan Reservoir spillway energy dissipation and erosion problems,at the same time both the steps and the skew bucket are safety in structure.
出处 《人民黄河》 CAS 北大核心 2014年第3期117-119,122,共4页 Yellow River
基金 教育部跨世纪优秀人才培养计划项目(2011SCU-NCET-10-0589) 国家自然科学基金资助项目(51179113 51009102)
关键词 消能防冲 优化 阶梯溢洪道 扭曲挑坎 真金万水库 energy dissipation optimize stepped spillway skew bucket Zhenjinwan Reservoir
  • 相关文献

参考文献5

二级参考文献17

  • 1才君眉,薛慧涛,冯金鸣.碾压混凝土坝采用台阶式溢洪道消能初探[J].水利水电技术,1994,25(4):19-21. 被引量:16
  • 2何小惠,黄智敏,朱红华,钟勇明,冯小丽.阳江核电水库溢洪道消能试验研究[J].中国农村水利水电,2005(6):67-69. 被引量:9
  • 3蒋晓光.阶梯式溢流消能浅析[J].泄水工程与高速水流,1992,(4):37-40. 被引量:2
  • 4黄智敏 何小惠.秋风岭水库溢洪道改建工程试验研究[J].中国农村水利水电,2004,. 被引量:4
  • 5Stephenson D.Energy dissipation down stepped spillways[J].Intl.Water Power and Dam Construction,1991,43(9):27~30. 被引量:1
  • 6Peyras L,Royet P and Degoutte G.Flow and energy dissipation over stepped gabion weirs[J].Journal of Hydraulic Engineering,ASCE,1992,118(5):707~717. 被引量:1
  • 7Christodoulou G C.Energy dissipation on stepped spillways[J].Journal of Hydraulic Engineering,ASCE,1993,119(5):644~651. 被引量:1
  • 8Rice C E and Kadavy K C.Model study of a roller compacted concrete stepped spillway[J].Journal of Hydraulic Engineering,1996,122(6):292~297. 被引量:1
  • 9Yildiz D and Kas I.Hydraulic performance of stepped chute spillway[J].Hydropower and Dams,1998,(4):64~70. 被引量:1
  • 10Pegram G G S,Officer A K and Mottram S R.Hydraulics of skimming flow on modeled stepped spillways[J].Journal of Hydraulic Engineering,1999,125(5):500~510. 被引量:1